Skip to content
Accelerate BPSBUSINESS PERFORMANCE SOLUTIONS, home

Build operational systems that last.

Helping Australian SMEs improve productivity and strengthen frontline leadership.

$2m

in working capital found

Apparel distributor

1 week

to a costed Diagnostic

Every Diagnostic

$400k

a year in wage savings found

Building products manufacturer

What I do, in three practice areas

I help owners find where money is lost in operations, and fix it with their own people.

For owners and general managers of growing manufacturing, construction and distribution businesses. Hands-on, on the floor, measured in dollars.

Also available as supporting services

ISO 9001, 45001 and 14001

Start small, and decide after each step.

Start with one conversation, not a contract.

Four named steps with fixed scopes. You see a small first step, and you decide after each one.

Result for an Australian building products manufacturer

$400,000 a year

Found on one factory floor.

Wages were high and throughput was flat. Time on the floor with the machine operators showed why.

The answer sat in the workforce structure. Better scheduling and closer coordination showed a potential $400,000 a year in wages, and room for more throughput.

A Diagnostic on the factory floor

Industry
Building products
Site
One factory
A welder working on a factory floor

How the work ran

Illustrative. Real dates from the client file.

Timeline: Diagnostic from week 1, 1 wk; Scheduling from week 2, 2 wks; Daily targets from week 4, 9 wks; Coordination from week 4, still running. $400k a year identified at the end of week 1.

  • Wages up, throughput flat.

    Wage costs were high and the floor wasn't producing what it could. The cause sat in how the workforce was structured and coordinated.

    Coordination had drifted

  • What we did

    Better scheduling, built with the people on the floor.

    Time on the factory floor with the machine operators, matching labour to output. Then closer coordination across the business.

    Worked out with the operators

  • What lasted

    A daily target for every station.

    Supervisors got a practical place to start: a daily target for each station.

    A target for each station

Their words

What owners and operations leads said after we worked the floor with their teams.

Dion spent time on the factory floor engaging with machine operators. A key finding was our workforce structure and coordination. Dion identified through analysis and operational changes we had a potential $400,000 a year cost saving in wages as well as untapped potential in throughput. He helped us see where better scheduling and closer coordination across the business could make a significant difference in our bottom line and service offering to our customers. It also gave our supervisors a practical place to start, with daily targets for each station.

Australian building products manufacturerWorkforce structure and scheduling
Work with us

Testimonial 1 of 4

On the floor,not in the boardroom.

I'm Dion Van Zyl. For 20 years I've run and improved operations in South Africa, New Zealand and Australia. Now I work one-on-one with owners of growing businesses, on site, with your people.

More about Dion

Dion Van Zyl

Operational Excellence Partner

Dion Van Zyl, Operational Excellence Partner
  • 20years

    running and improving operations, on the floor

    Manufacturing · Logistics · Building products

  • 3countries

    • ZASouth Africa
    • NZNew Zealand
    • AUAustralia
  • I don’t send a junior team. I work with your people, on site.

    Dion Van ZylOperational Excellence Partner

Notes from the floor.

Short, practical reads from Dion on productivity, people and running a better operation. Open any article to read it in full, right here.

  • $400k a year found on one factory floor
  • $2m in working capital, found on the racks
  • 20 years on factory floors in three countries

Book a 30-minute conversation.

Let's look at yours. Free, on site, and focused on the problem that costs you most.

  1. 01You tell me the problem.Free. No contract.Your first step30minOn site or by phoneDion Van Zyl
  2. 02I walk the floor.I ask questions and look at how the work actually runs.
  3. 03You get a straight answer.A Diagnostic if there's a real opportunity. If not, I'll say so.